金彩汇Shandong Decao Machinery&Equipment Co.Ltd
Contact:Manager Dai
Telephone:+86-13573175352
Q Q:1811553686
金彩汇E-mail:decao005@jnfoodmachinery.com
Phone:0531-88815608
Fax :0531-88816598
Website:sukacagitespiti.net
Address:No. 7, Zone C, Rural Revitalization Industrial Park, Xuanzhangtun Town, Qihe County, Dezhou City, Shandong P.R.China
The Crispy chips/Bugles production line efficiently combines the mixing, extruding, moulding, frying and flavouring packaging processes. The ingredients can be single, such as rice flour, corn flour, wheat flour, etc., or a mixture of them.
variety shapes, such as rice crusts, chips, bugles, pizza rolls, doritos shape by adjusting the mould in the production line machine .
Technical Parameters
主机型号 Model | DL-65-ll | DL-70-ll |
Input Voltage | 380V/50HZ | 380V/50HZ |
Installed Capacity | 82KW | 105KW |
Power Consumption | 58KW | 78KW |
Capacity | 120-150kg/h | 180-250kg/h |
Length in space | 15000mm | 16000mm |
Corn flakes and breakfast cereals production line production process:
Mix-Screw elevator-Double screw extruder-Pulling and cutting machine-Batch frying-Seasoning machine
Mix | The mixing process is a key process in bread crumbs production. The basic process is to weigh the raw materials of different weights according to the formula, then pour them into the crusher and smash them, and then temporarily store all the materials in the storage bin. Then all the ingredients are ready, put them in the blender and mix them. |
Screw elevator | Allow the mixed material to be transported to the next stage |
Double screw extruder | Extrusion is a high temperature, short time heat treatment process. Through the extruder different mold (template) , can produce each kind of shape . |
Pulling and cutting machine | Stretching to the next device to cut into the specified size and shape |
Batch frying
| Secondary expansion of the product |
Seasoning machine
| Used to adjust the product taste |
Q1: What kinds of products can be made?
A: Doritos/Tortila Chips/Crispy Rice Crust/Bugles Fried Pellets Production Line.
Q2: What's the delivery time?
A: We usually need 40-45 days for large sizes, depends on the finished product.
Q3: What about the installation service?
A: We will send 1 engineer to the buyer's factory for a around 10-day period installation and training to the operators.